1Ci Support Help Center home page
Submit a request
Sign in
  1. 1Ci Support
  2. 1C:Drive User Guide
  3. Glossary

Planning interval

  • Glossary
    • Accounting transaction template
    • Base unit
    • Bill of materials (BOM)
    • By-products
    • Component
    • Cost driver
    • Cost pool
    • Finished product
    • Foreign currency
    • Manufacturing overheads
See more

<< Prev   Next >>

A minimum period for scheduling operations in the multioperation make-to-order process. This period is defined for a production department depending on the production process needs. The shorter the period, the more detailed the production schedule. For instance, if this period is 5 minutes, operations are scheduled for each 5-minutes interval within a planning horizon.

<< Prev   Next >>

© 2020-2022 1C INTERNATIONAL LLC www.1Ci.com Support policy